ब्रेकिङ
0:39

एआई आवाजMusic: Voice Over Under by Kevin MacLeod (incompetech.com), CC BY 4.0

वातावरणभिडियो

BP Highway remains blocked by landslides and river erosion

Efforts to reopen the route in Kavrepalanchok continue after four days of continuous rain caused blockages in multiple wards.

स्वतः प्रकाशित · नियमित

पूरा समाचार पढ्नुहोस्

पाठ · क्याप्सन
  1. 0:01The BP Highway in Kavrepalanchok is
  2. 0:04still blocked due to recent
  3. 0:05weather events
  4. 0:07Four days of continuous rain caused
  5. 0:09landslides and river erosion in
  6. 0:11multiple sections
  7. 0:13Local authorities are currently working to
  8. 0:16clear the route and reopen
  9. 0:17the highway
  10. 0:19Residents are urging the government to
  11. 0:21secure funds and conduct technical studies
  12. 0:23for a stronger road
  13. 0:26This report is based on information
  14. 0:28from Ratopati Khabarhub Reporters Nepal
  15. 0:31and OnlineKhabar
  16. 0:33For the full story visit wenepal.com

स्वतः प्रकाशित · नियमित. यो सारांश सूचीबद्ध स्रोतबाट एआईको सहायतामा तयार गरी नियमित समाचारका स्वचालित जाँच पास गरेपछि प्रकाशित भएको हो। सम्पादकले दैनिक नमुना जाँच गर्छन्। हामी एआई कसरी प्रयोग गर्छौँ