ताजा
समाजभिडियो

गुल्मीमा पहिरो पन्छाइएपछि कालीगण्डकी करिडोर सञ्चालनमा

The blocked section of the highway in Gulmi has resumed operation following the removal of debris and rocks.

पूरा समाचार पढ्नुहोस्

पाठ · क्याप्सन
  1. 0:01The Kaligandaki Corridor road section in Gulmi has reopened
  2. 0:05following a landslide
  3. 0:07A dozer was used to clear
  4. 0:09the debris and rocks that had
  5. 0:10blocked the highway
  6. 0:12The operation was coordinated with the
  7. 0:14Road Division Office and local authorities
  8. 0:18Deputy Superintendent of Police Virendra Beer
  9. 0:21Bishwakarma confirmed the reopening
  10. 0:25For the full story visit wenepal.com