Breaking
0:39

AI voiceMusic: Voice Over Under by Kevin MacLeod (incompetech.com), CC BY 4.0

Three cranes deployed to free Rhino cruise ship lodged at Narayani Bridge

The vessel drifted after floodwaters broke its mooring ropes near Hotel River Crown on Sunday evening.

Auto-published · routine

Read the full story

Transcript · Captions
  1. 0:01Three cranes have been deployed to
  2. 0:03dislodge the Rhino cruise ship from
  3. 0:05the Narayani Bridge
  4. 0:07The 70-tonne vessel was swept downstream
  5. 0:10after heavy river currents broke its
  6. 0:11moorings near Hotel River Crown
  7. 0:15Rescue teams are working to guide
  8. 0:17the ship away from the bridge
  9. 0:18pillar towards Gaindakot
  10. 0:21The 180-passenger vessel was built with
  11. 0:23an investment of roughly 150
  12. 0:26million rupees
  13. 0:28Reported by OnlineKhabar English and
  14. 0:31Khabarhub English
  15. 0:33For the full story visit wenepal.com

Auto-published · routine. This summary was drafted with AI from the sources listed and published after passing our automatic checks for routine stories. An editor reviews a daily sample. How we use AI