Breaking

BP Highway remains blocked by landslides and river erosion

Efforts to reopen the route in Kavrepalanchok continue after four days of continuous rain caused blockages in multiple wards.

WeNepal NewsroomAuto-published, routine

1 min read

Auto-published · routine
0:39
News card showing headline 'BP Highway remains blocked by landslides and river erosion' in the environment category, citing Ratopati, Khabarhub, Reporters Nepal, and OnlineKhabar.

In short

  • BP Highway blocked by landslides and Roshhi River erosion after four days of rain.
  • Blockages reported in Namobuddha, Roshhi, and Mamtie wards in Kavrepalanchok.
  • Locals urge government to secure funds and conduct technical studies for reconstruction.

Continuous rainfall over the past four days has triggered landslides and river erosion, blocking the BP Highway in several locations. The Khurkot to Bhakunde Bensi section remains closed as of the latest reports. The Roshhi River's erosion has significantly impacted the road's stability in these areas. Specific blockages were identified in Namobuddha ward 6, Roshhi wards 7, 8, and 11. These sections were completely obstructed due to the severity of the landslides. Efforts to reopen the highway are currently underway by local teams. A local official noted that temporary diversions are causing significant issues, with small vehicles scraping the ground and posing risks to passengers. The official stated that the state must secure immediate resources for the reconstruction of the BP Highway. Residents expect the government to consider local input and conduct technical studies to build a structure capable of withstanding natural disasters. They are urging authorities to carefully review their suggestions before proceeding with the work. The government has previously claimed that the road reconstruction would be completed within two years. However, the current situation highlights the ongoing challenges posed by floods and landslides despite these reconstruction efforts.

Auto-published · routine. This summary was drafted with AI from the sources listed and published after passing our automatic checks for routine stories. An editor reviews a daily sample. How we use AI

https://wenepal.com/article/bp-highway-remains-blocked-by-landslides-and-river-erosion-20260930

Your reaction

Comments

Comments are not open yet. We are building moderation first so the conversation stays safe. Use the contact form to reach the newsroom.

Contact

Related stories

Rain blocks 11 highways across Nepal, Department of Roads says

Traffic on 11 highways and a number of other road sections has been disrupted by floods and landslides brought on by rain that has continued since 24 September, the Department of Roads said in a notice on the morning of 26 September 2026. The Prithvi Highway is obstructed at Krishnabhir, Chaukibhir, Jawangkhola and Fisling, affecting vehicles heading to Kathmandu. The BP Highway is blocked at Mamti, Piple, Daunne-Kalopul, Charsayabesi, Katunje and Chaukidanda. Vehicles have been halted day and night in stretches judged high-risk while landslide debris is cleared. Traffic through the Makwanpur section of the Kanti Highway has resumed. Sources: Republica, Khabarhub English · AI-assisted summary by WeNepal

Buses held at Kathmandu as landslides cut Prithvi and BP highways

Public transport in and out of Kathmandu was on hold on 25 September 2026 after landslides and floods, brought on by continuous rain since Thursday, blocked the Prithvi and BP highways at several points, said Superintendent of Police Naresh Raj Subedi, spokesperson for the Kathmandu Valley Traffic Police Office. Light vehicles are still leaving the city by the Pharping route. Pankaj Malla, general manager of Lhotse Multipurpose Pvt Ltd, said buses at the Gongabu-based New Bus Park have been held since Thursday evening. With rivers inside the valley rising, traffic police have asked owners not to park along river corridors, and agencies have warned of heavy rain nationwide from 24 to 28 September. Sources: The Annapurna Express, Republica · AI-assisted summary by WeNepal

Flood alert in Narayani River as water level rises

The Narayani River has crossed the alert level after rains began on Thursday. The Narayani Basin Office in Chitwan reports the water surface at ८ दशमलव ३० मिटर. Chief Officer Sumit says the river flow is increasing and residents in the coastal area should stay alert. He notes that ७ दशमलव ३० मिटर is the warning threshold and ९ मिटर would trigger a danger level. The river has not yet flooded settlements, but the Deputy District Officer Ganesh Aryal urges people to move to safer places. Sources: OnlineKhabar, Khabarhub · AI-assisted summary by WeNepal

Landslides block Prithvi Highway and Narayangadh-Muglin road

Heavy rainfall has caused landslides that blocked the Narayangadh-Muglin road and the Prithvi Highway. Anil Thapa, Chief of the District Traffic Police Office, reported a landslide near the Namsi River on the Narayangadh-Muglin section. Two separate landslides also obstructed the Prithvi Highway. Authorities are currently working to clear the debris and restore vehicular movement on the affected routes. The disruption affects traffic in the region due to the ongoing weather conditions. Sources: The Annapurna Express, The Himalayan Times · AI-assisted summary by WeNepal

Nepal, in minutes — in your inbox

The Pulse every morning. No spam, unsubscribe any time.