Vehicular movement along the Kaligandaki Corridor road has been completely disrupted following a dry landslide on Sunday evening. The obstruction occurred along the Rakse section situated in Ward No. 2 of Kaligandaki Rural Municipality, Gulmi district, where rocks and dry debris cascaded down onto the highway from the hillside above. A local official confirmed that the road became entirely impassable in the evening. The sudden blockage occurred just three days after vehicular access along the corridor had been successfully resumed. Chairperson Thapa explained that continuous falls of rocks from above made immediate travel through the area unsafe for commuters. Clearance operations have been postponed until Monday morning due to ongoing risks posed by falling debris. Local authorities stated that bulldozers will be deployed to clear the debris only after inspecting the physical condition of the landslide site in the daylight. Reports note that travellers have been left stranded along the highway route between locations such as Butwal as a result of the halt in traffic.
Dry Landslide Blocks Kaligandaki Corridor Road Sector in Gulmi
Traffic along the Rakse section came to a halt on Sunday evening following falling rocks.
1 min read
0:33
In short
- Dry landslide blocks Kaligandaki Corridor at Rakse in Gulmi Ward 2.
- Road obstruction occurs just three days after traffic was restored.
- Bulldozers to be deployed Monday morning following risk assessment.
From public sources and the WeNepal research team
https://wenepal.com/article/dry-landslide-blocks-kaligandaki-corridor-road-sector-in-gulmi-20261115

Comments
Comments are not open yet. We are building moderation first so the conversation stays safe. Use the contact form to reach the newsroom.
Contact