Breaking

Krishnabhir landslide cleared, traffic back on Nagdhunga-Muglin road

Clearing work continues at seven other points on the road section, and the project warns that continued rain keeps the risk of fresh slides alive.

WeNepal NewsroomAuto-published, routine

1 min read

Updated

Auto-published · routine
0:39
News card: Krishnabhir landslide cleared, traffic back on Nagdhunga-Muglin road. Environment. Sources: Ratopati English.

In short

  • Landslide debris at Krishnabhir cleared; vehicles moving again on the Nagdhunga-Muglin road section
  • Gabion wall beside the road collapsed, but 2 to 3 metres of ground remain from the main track
  • Heavy machinery clearing slides at seven other points including Panidhara, Dharapani, Jawang, Jalbire and Rorang

Traffic has resumed on the Nagdhunga-Muglin road section after crews cleared the landslide debris at Krishnabhir, according to Ratopati English. Satendra Mishra, Information Officer of the Nagdhunga-Muglin Road Project (West Section), said vehicles could pass once the material was removed. The slide had come down on the road's retaining wall, and the gabion wall on the side has collapsed. Mishra said the road could still be used for now because 2 to 3 metres of ground remain between the main track and the collapsed section, and the surface shows no major cracks. He said “the main track is safe” but cautioned that further landslides, or a collapse of the road itself, remain possible if the rain continues. The project says heavy machinery has been deployed to clear slides at seven other points along the section. Work is under way at Panidhara, Dharapani, Jawang, Jalbire and Rorang, among other places, Mishra said. Rain in the area is making the task harder, and the project expects vehicle movement to become smooth only once every site has been fully cleared. Travellers have been urged to stay cautious while the risk of rain and landslides persists.

Auto-published · routine. This summary was drafted with AI from the sources listed and published after passing our automatic checks for routine stories. An editor reviews a daily sample. How we use AI

https://wenepal.com/article/krishnabhir-landslide-cleared-traffic-back-on-nagdhunga-muglin-road-20260926

Your reaction

Comments

Comments are not open yet. We are building moderation first so the conversation stays safe. Use the contact form to reach the newsroom.

Contact

Related stories

Rain blocks 11 highways across Nepal, Department of Roads says

Traffic on 11 highways and a number of other road sections has been disrupted by floods and landslides brought on by rain that has continued since 24 September, the Department of Roads said in a notice on the morning of 26 September 2026. The Prithvi Highway is obstructed at Krishnabhir, Chaukibhir, Jawangkhola and Fisling, affecting vehicles heading to Kathmandu. The BP Highway is blocked at Mamti, Piple, Daunne-Kalopul, Charsayabesi, Katunje and Chaukidanda. Vehicles have been halted day and night in stretches judged high-risk while landslide debris is cleared. Traffic through the Makwanpur section of the Kanti Highway has resumed. Sources: Republica, Khabarhub English · AI-assisted summary by WeNepal

Buses held at Kathmandu as landslides cut Prithvi and BP highways

Public transport in and out of Kathmandu was on hold on 25 September 2026 after landslides and floods, brought on by continuous rain since Thursday, blocked the Prithvi and BP highways at several points, said Superintendent of Police Naresh Raj Subedi, spokesperson for the Kathmandu Valley Traffic Police Office. Light vehicles are still leaving the city by the Pharping route. Pankaj Malla, general manager of Lhotse Multipurpose Pvt Ltd, said buses at the Gongabu-based New Bus Park have been held since Thursday evening. With rivers inside the valley rising, traffic police have asked owners not to park along river corridors, and agencies have warned of heavy rain nationwide from 24 to 28 September. Sources: The Annapurna Express, Republica · AI-assisted summary by WeNepal

Landslides block Jomsom-Koral road, stranding China trade containers

Continuous rain has blocked the Jomsom-Koral road in Mustang, the District Police Office Mustang said, Ratopati English reported. Landslides hit three points on the route to the Koral pass; one at Ghami in Upper Mustang has been cleared, but the road remains shut at Kalobhir above Chaili and on the Kagbeni-Tangwe stretch. Containers carrying goods to and from the Koral pass are stuck, disrupting trade with China, and hundreds of electric vehicles brought in from China are held up in Jomsom. The Beni-Jomsom section was also blocked in several places, according to the road's project chief. Sources: Ratopati English · AI-assisted summary by WeNepal

Women who lost shops in the August 26 flood seek help to restart

Women who ran small businesses along the rivers of Nuwakot, Rasuwa and Dhading lost stock, savings and premises in the August 26 flood, and many say they want support to trade again rather than relief alone, The Kathmandu Post reported. The government's Rs15,000 monthly housing allowance covers families who lost permanent homes, but there is no clear arrangement for those who rented shops. Officials in Nuwakot put the number of directly affected small traders and household businesses at more than 2,000. Bagmati Province says revival programmes for small entrepreneurs will follow once immediate relief ends. Sources: The Kathmandu Post · AI-assisted summary by WeNepal

Nepal, in minutes — in your inbox

The Pulse every morning. No spam, unsubscribe any time.