Breaking

Landslides shut BP and Prithvi highways as heavy rain persists

The Prithvi Highway and Narayanghat-Muglin road in Chitwan are closed until further notice; the BP Highway is under night-time restriction until Sunday.

WeNepal NewsroomAuto-published, routine

2 min read

Updated

Auto-published · routine
0:40
News card: Landslides shut BP and Prithvi highways as heavy rain persists. Environment. Sources: The Kathmandu Post.

In short

  • BP Highway blocked at Charsayabensi and Gimdi in Kavrepalanchok at around 4:30am; night closures until Sunday
  • Prithvi Highway and the Narayanghat-Muglin road in Chitwan closed until further notice
  • Seven landslide sites on the Prithvi Highway in Dhading; Krishnabhir and Tigraang Khola fully blocked

Persistent rainfall brought down landslides at several locations on Friday, leaving a number of Nepal's main highways either shut or under restrictions and disrupting travel between Kathmandu and the rest of the country, according to The Kathmandu Post. Police said the BP Highway was cut early in the morning, at about 4:30am, when landslides came down at Charsayabensi in Roshi Rural Municipality-7 and at Gimdi in Roshi-8, both in Kavrepalanchok district. In response to the weather forecast, the authorities have also barred vehicles from the Kavrepalanchok stretch of the BP Highway between 5pm and 5am until Sunday morning. Daytime traffic may be halted too if flood and landslide conditions worsen. Chief District Officer Gopal Kumar Adhikari said a decision on extending the closure into daylight hours would follow an assessment of conditions on the ground. Chitwan has closed the Prithvi Highway and the Narayanghat-Muglin road until further notice because of landslides and the danger of more slips after continuous rain. Chief District Officer Ganesh Aryal said traffic was first stopped overnight, from 8pm on Thursday to 5am on Friday, before the closure was extended as the rain went on. District authorities say more than 10,000 vehicles use the Narayanghat-Muglin road daily and more than 14,000 travel the Prithvi Highway. In neighbouring Dhading, the Prithvi Highway has been hit at seven places: Krishnabhir, Parewabhir, Jyamireghat, Jahare, Jabangkhola, Tigraang Khola and Kamerebhir. Krishnabhir and Tigraang Khola are fully blocked, and only one lane is open at the other five. Crews have started removing debris at Krishnabhir with two pieces of equipment, but ongoing rain and fresh slides are hampering the effort. The Kanti Lokpath, which links Kathmandu with Makwanpur and Hetauda, has also been affected, with landslides at three points on the Lalitpur side blocking the route, Makwanpur police chief Shyam Bahadur Khati said. Officials are urging residents near rivers and in slide-prone settlements to stay alert, and motorists have been advised to check the latest road conditions before setting out, since further rain could cause new blockages.

Auto-published · routine. This summary was drafted with AI from the sources listed and published after passing our automatic checks for routine stories. An editor reviews a daily sample. How we use AI

https://wenepal.com/article/landslides-shut-bp-and-prithvi-highways-as-heavy-rain-persists-20260926

Your reaction

Comments

Comments are not open yet. We are building moderation first so the conversation stays safe. Use the contact form to reach the newsroom.

Contact

Related stories

Buses held at Kathmandu as landslides cut Prithvi and BP highways

Public transport in and out of Kathmandu was on hold on 25 September 2026 after landslides and floods, brought on by continuous rain since Thursday, blocked the Prithvi and BP highways at several points, said Superintendent of Police Naresh Raj Subedi, spokesperson for the Kathmandu Valley Traffic Police Office. Light vehicles are still leaving the city by the Pharping route. Pankaj Malla, general manager of Lhotse Multipurpose Pvt Ltd, said buses at the Gongabu-based New Bus Park have been held since Thursday evening. With rivers inside the valley rising, traffic police have asked owners not to park along river corridors, and agencies have warned of heavy rain nationwide from 24 to 28 September. Sources: The Annapurna Express, Republica · AI-assisted summary by WeNepal

Krishnabhir landslide cleared, traffic back on Nagdhunga-Muglin road

Vehicles are moving again on the Nagdhunga-Muglin road section after landslide debris at Krishnabhir was removed, Ratopati English reports. Satendra Mishra, Information Officer of the Nagdhunga-Muglin Road Project (West Section), said the slide had fallen on the road's retaining wall and the gabion wall beside it had collapsed, but 2 to 3 metres of ground still separate the main track from the damage and the surface shows no major cracks. Heavy machinery has been deployed to clear slides at seven other points, including Panidhara, Dharapani, Jawang, Jalbire and Rorang. Continued rain is slowing the work, and travellers have been urged to take care. Sources: Ratopati English · AI-assisted summary by WeNepal

Chitwan National Park urges heightened vigilance amid flood risk

The Chitwan National Park office has asked staff, local groups and visitors to adopt high vigilance as continuous rain raises flood and landslide risks in the park and its buffer zone. Information officer and conservation officer Avinash Thapamagar said the Narayani, Rapti and Riu rivers and smaller streams are likely to experience higher flow, increasing the chance of flooding and riverbank erosion. The park urges only travel with weather forecasts and to avoid hazardous river and stream areas during adverse conditions. Sources: OnlineKhabar, Khabarhub, Reporters Nepal · AI-assisted summary by WeNepal

Heavy rain prompts night travel bans and evacuations across Nepal

Persistent rain has disrupted transport and raised flood and landslide risks in several parts of Nepal, The Kathmandu Post reported on Friday. In Taplejung the Mechi Highway reopened after a landslide at Khoksekhol, but the district administration has barred night driving while heavy rain is forecast; Gulmi and Arghakhanchi have imposed similar overnight limits and Ramechhap has urged residents to avoid unnecessary overnight travel. At the Koshi Barrage, 31 gates were open by Friday afternoon as the flow reached 240,555 cusecs. Fourteen families in Kanchanpur were moved to a school, two houses collapsed in Kavrepalanchok, water overflowed at the Arun-3 site in Sankhuwasabha, and Manang has advised against high-altitude trekking for three days. Sources: The Kathmandu Post · AI-assisted summary by WeNepal

Nepal, in minutes — in your inbox

The Pulse every morning. No spam, unsubscribe any time.