Breaking

Landslide blocks Prithvi Highway in Tanahun

Traffic movement came to a complete halt this morning following debris accumulation at two locations.

WeNepal NewsroomAuto-published, routine

1 min read

Auto-published · routine
0:32
Landslide blocks Prithvi Highway in Tanahun, a society news story based on reports from Republica and The Rising Nepal.

In short

  • The Prithvi Highway suffered a complete blockage following a morning landslide in Tanahun.
  • Security personnel from the district police office arrived at the scene to handle the obstruction.
  • Authorities are actively working to remove the debris and resume transportation services.

Travelers faced significant transit delays after a morning landslip obstructed the arterial roadway in Tanahun district. The obstruction occurred early in the day within the administrative area of Byas Municipality-12 Ghansikuwa. Law enforcement authorities confirmed that traffic movement stopped completely across the affected section. Officials noted that the roadway faced blockages at multiple points within the district. A team of officers from the district police office arrived at the location shortly after the incident was reported. Security personnel initiated cleanup operations to clear the fallen earth and reopen the route for commuters.

Auto-published · routine. This summary was drafted with AI from the sources listed and published after passing our automatic checks for routine stories. An editor reviews a daily sample. How we use AI

https://wenepal.com/article/landslide-blocks-prithvi-highway-in-tanahun-20261001

Your reaction

Comments

Comments are closed on stories in sensitive categories.

Contact

Related stories

Subsidence and landslides slow Prithvi Highway traffic in Chitwan

Continuous rain has caused the road to sink and landslides to fall at several points of the Prithvi Highway in Ichchhakamana Rural Municipality, Chitwan, disrupting transport, Khabarhub and Reporters Nepal reported on 26 September 2026. On the Chitwan side, the Mugling–Mauwakhola stretch is open to one-way traffic, while the Dhading section has not yet fully reopened. At Dharapani in ward 4 the road has subsided further, so only small vehicles are being let through, one way at a time. Near Mugling, a landslide at Simaldhara in ward 5 has reduced the road to a single lane, and falling rocks are hampering clearance. The agencies responsible say they are monitoring the road and running traffic with caution. Sources: Khabarhub, Reporters Nepal · AI-assisted summary by WeNepal

Buses held at Kathmandu as landslides cut Prithvi and BP highways

Public transport in and out of Kathmandu was on hold on 25 September 2026 after landslides and floods, brought on by continuous rain since Thursday, blocked the Prithvi and BP highways at several points, said Superintendent of Police Naresh Raj Subedi, spokesperson for the Kathmandu Valley Traffic Police Office. Light vehicles are still leaving the city by the Pharping route. Pankaj Malla, general manager of Lhotse Multipurpose Pvt Ltd, said buses at the Gongabu-based New Bus Park have been held since Thursday evening. With rivers inside the valley rising, traffic police have asked owners not to park along river corridors, and agencies have warned of heavy rain nationwide from 24 to 28 September. Sources: The Annapurna Express, Republica · AI-assisted summary by WeNepal

Rain blocks 11 highways across Nepal, Department of Roads says

Traffic on 11 highways and a number of other road sections has been disrupted by floods and landslides brought on by rain that has continued since 24 September, the Department of Roads said in a notice on the morning of 26 September 2026. The Prithvi Highway is obstructed at Krishnabhir, Chaukibhir, Jawangkhola and Fisling, affecting vehicles heading to Kathmandu. The BP Highway is blocked at Mamti, Piple, Daunne-Kalopul, Charsayabesi, Katunje and Chaukidanda. Vehicles have been halted day and night in stretches judged high-risk while landslide debris is cleared. Traffic through the Makwanpur section of the Kanti Highway has resumed. Sources: Republica, Khabarhub English · AI-assisted summary by WeNepal

Krishnabhir landslide cleared, traffic back on Nagdhunga-Muglin road

Vehicles are moving again on the Nagdhunga-Muglin road section after landslide debris at Krishnabhir was removed, Ratopati English reports. Satendra Mishra, Information Officer of the Nagdhunga-Muglin Road Project (West Section), said the slide had fallen on the road's retaining wall and the gabion wall beside it had collapsed, but 2 to 3 metres of ground still separate the main track from the damage and the surface shows no major cracks. Heavy machinery has been deployed to clear slides at seven other points, including Panidhara, Dharapani, Jawang, Jalbire and Rorang. Continued rain is slowing the work, and travellers have been urged to take care. Sources: Ratopati English · AI-assisted summary by WeNepal

Nepal, in minutes — in your inbox

The Pulse every morning. No spam, unsubscribe any time.