Breaking

Subsidence and landslides slow Prithvi Highway traffic in Chitwan

One-way movement is in place on the Mugling–Mauwakhola stretch, while the Dhading section has yet to reopen fully, reports say.

WeNepal NewsroomAuto-published, routine

2 min read

Updated

Auto-published · routine
0:38
News card: Subsidence and landslides slow Prithvi Highway traffic in Chitwan. Environment. Sources: Khabarhub, Reporters Nepal.

In short

  • Mugling–Mauwakhola stretch open to one-way traffic; Dhading section not yet fully reopened
  • Only small vehicles allowed through Dharapani, ward 4, after the road sank further
  • Landslide at Simaldhara near Mugling keeps shedding rocks, hampering clearance

Persistent rainfall has left parts of the Prithvi Highway in Chitwan's Ichchhakamana Rural Municipality sinking or covered by landslides, and transport along the route has been affected as a result, according to reports published by Khabarhub and Reporters Nepal on 26 September 2026. Both outlets describe the same set of trouble spots along the highway. On the Chitwan side, vehicles are moving one way at a time through the Mugling–Mauwakhola stretch, while the Dhading section has still not been brought back into full operation. At Dharapani, in ward 4 of the rural municipality, the road has sunk further, and only small vehicles are being allowed through, again in a single direction. With the sinking continuing under steady rain, travel through that area has become risky, the reports said. A landslide at Simaldhara, in ward 5 near Mugling, has also cut the road to one lane. Rocks keep coming down from the slide, which is making it difficult to clear the debris from the carriageway. Because the subsidence and the landslides have not stopped, driving on the highway remains hazardous. The agencies responsible say they are keeping the road under watch and letting traffic move with caution according to the level of risk.

Auto-published · routine. This summary was drafted with AI from the sources listed and published after passing our automatic checks for routine stories. An editor reviews a daily sample. How we use AI

https://wenepal.com/article/subsidence-and-landslides-slow-prithvi-highway-traffic-in-chitwan-20260926

Your reaction

Comments

Comments are not open yet. We are building moderation first so the conversation stays safe. Use the contact form to reach the newsroom.

Contact

Related stories

Rain blocks 11 highways across Nepal, Department of Roads says

Traffic on 11 highways and a number of other road sections has been disrupted by floods and landslides brought on by rain that has continued since 24 September, the Department of Roads said in a notice on the morning of 26 September 2026. The Prithvi Highway is obstructed at Krishnabhir, Chaukibhir, Jawangkhola and Fisling, affecting vehicles heading to Kathmandu. The BP Highway is blocked at Mamti, Piple, Daunne-Kalopul, Charsayabesi, Katunje and Chaukidanda. Vehicles have been halted day and night in stretches judged high-risk while landslide debris is cleared. Traffic through the Makwanpur section of the Kanti Highway has resumed. Sources: Republica, Khabarhub English · AI-assisted summary by WeNepal

Chitwan National Park urges heightened vigilance amid flood risk

The Chitwan National Park office has asked staff, local groups and visitors to adopt high vigilance as continuous rain raises flood and landslide risks in the park and its buffer zone. Information officer and conservation officer Avinash Thapamagar said the Narayani, Rapti and Riu rivers and smaller streams are likely to experience higher flow, increasing the chance of flooding and riverbank erosion. The park urges only travel with weather forecasts and to avoid hazardous river and stream areas during adverse conditions. Sources: OnlineKhabar, Khabarhub, Reporters Nepal · AI-assisted summary by WeNepal

Buses held at Kathmandu as landslides cut Prithvi and BP highways

Public transport in and out of Kathmandu was on hold on 25 September 2026 after landslides and floods, brought on by continuous rain since Thursday, blocked the Prithvi and BP highways at several points, said Superintendent of Police Naresh Raj Subedi, spokesperson for the Kathmandu Valley Traffic Police Office. Light vehicles are still leaving the city by the Pharping route. Pankaj Malla, general manager of Lhotse Multipurpose Pvt Ltd, said buses at the Gongabu-based New Bus Park have been held since Thursday evening. With rivers inside the valley rising, traffic police have asked owners not to park along river corridors, and agencies have warned of heavy rain nationwide from 24 to 28 September. Sources: The Annapurna Express, Republica · AI-assisted summary by WeNepal

Women who lost shops in the August 26 flood seek help to restart

Women who ran small businesses along the rivers of Nuwakot, Rasuwa and Dhading lost stock, savings and premises in the August 26 flood, and many say they want support to trade again rather than relief alone, The Kathmandu Post reported. The government's Rs15,000 monthly housing allowance covers families who lost permanent homes, but there is no clear arrangement for those who rented shops. Officials in Nuwakot put the number of directly affected small traders and household businesses at more than 2,000. Bagmati Province says revival programmes for small entrepreneurs will follow once immediate relief ends. Sources: The Kathmandu Post · AI-assisted summary by WeNepal

Nepal, in minutes — in your inbox

The Pulse every morning. No spam, unsubscribe any time.