Vehicular movement along the Nagdhunga-Muglin road section continues on a restricted basis following intermittent debris falling from the slopes above. Soil and stones have been sliding down periodically in the Ghoptesir sector, posing ongoing safety risks to motorists traveling through the corridor. Small cars and light vehicles are currently permitted to travel in both directions, while heavier transport options must rely on single-lane alternating passage. Officials decided against a full closure to protect holiday travelers from intense logistical hardships during the peak festival travel period. Engineer Ashok Devkota, representing the West Section of the Nagdhunga-Muglin Road Project, explained that shutting down the route completely would cause severe difficulties for citizens returning home. The ongoing festival movement has placed exceptionally heavy pressure on the transportation network. Project representatives indicated that comprehensive debris removal operations and permanent stabilization efforts will begin once traffic volumes decline. Full two-way operations will be restored across the entire affected sector after the cleanup work concludes.
Nagdhunga-Muglin Route Runs One-Way Due to Landslide Threats
Vehicles continue to move despite falling debris at Ghoptesir to ease festival travel hardships.
1 min read
In short
- The Nagdhunga-Muglin road section operates on a one-way basis amid intermittent landslides.
- Falling soil and stones continue to affect the Ghoptesir area along the transport route.
- Authorities kept the road open to prevent severe travel hardships during the festival period.
From public sources and the WeNepal research team
https://wenepal.com/article/nagdhunga-muglin-route-runs-one-way-due-to-landslide-threats-20261112



Comments
Comments are not open yet. We are building moderation first so the conversation stays safe. Use the contact form to reach the newsroom.
Contact