Breaking

Narayangadh-Muglin road reopens while Prithvi Highway clearance continues

The Narayangadh-Muglin road resumed operations following a mudslide clearance, whereas eleven spots on the Prithvi Highway remain blocked.

WeNepal NewsroomAuto-published, routine

1 min read

Updated

Auto-published · routine
0:43
Narayangadh-Muglin road reopens while Prithvi Highway clearance continues - environment news from The Himalayan Times, Khabarhub English, Republica

In short

  • The Narayangadh-Muglin road reopened at 12:15 pm following a morning mudslide clearance.
  • Eleven locations on the Malekhu-Muglin stretch of the Prithvi Highway remain blocked.
  • Officials expect Prithvi Highway traffic to resume by evening if no new slides occur.

Traffic movement along the Narayangadh-Muglin route resumed at 12:15 pm on Sunday after an earlier mudslide disrupted transit. According to the Chitwan Road Division Office, the debris had accumulated near the Namshi Khola bridge at approximately 7:55 am, prompting immediate clearance work by teams on the ground. While the Narayangadh-Muglin section is operational, the Malekhu-Muglin stretch of the Prithvi Highway remains obstructed at eleven different locations due to persistent rainfall. Landslides involving mud, rocks, and fallen trees have affected travel, with specific disruptions noted around Fishling, Chumlingtar, and Dharapani. Engineers report that approximately 200 metres of road across three spots near Fishling are covered by debris, alongside pavement cracks and damage spanning about 50 metres across two locations in Dharapani. Additional blockages occurred near Benighat Bazaar and Krishnabhir. Authorities anticipate that traffic on the Prithvi Highway could resume by evening, provided no further major landslips occur. Clearance operations remain active across all affected trouble spots under the supervision of the Road Division Office.

Auto-published · routine. This summary was drafted with AI from the sources listed and published after passing our automatic checks for routine stories. An editor reviews a daily sample. How we use AI

https://wenepal.com/article/narayangadh-muglin-road-reopens-while-prithvi-highway-clearance-20261001

Your reaction

Comments

Comments are not open yet. We are building moderation first so the conversation stays safe. Use the contact form to reach the newsroom.

Contact

Related stories

Landslides shut BP and Prithvi highways as heavy rain persists

Several major highways were blocked or restricted on Friday after continuous rain set off landslides at multiple points, cutting road links between Kathmandu and other regions, The Kathmandu Post reports. The BP Highway was blocked at Charsayabensi and Gimdi in Kavrepalanchok at around 4:30am, and night closures from 5pm to 5am apply on its Kavrepalanchok section until Sunday morning. In Chitwan, the Prithvi Highway and the Narayanghat-Muglin road are shut until further notice. Landslides hit seven spots on the Prithvi Highway in Dhading, two of them fully blocked, and three locations on the Lalitpur side of the Kanti Lokpath. Police have asked travellers to check road conditions first. Sources: The Kathmandu Post · AI-assisted summary by WeNepal

Chitwan National Park urges heightened vigilance amid flood risk

The Chitwan National Park office has asked staff, local groups and visitors to adopt high vigilance as continuous rain raises flood and landslide risks in the park and its buffer zone. Information officer and conservation officer Avinash Thapamagar said the Narayani, Rapti and Riu rivers and smaller streams are likely to experience higher flow, increasing the chance of flooding and riverbank erosion. The park urges only travel with weather forecasts and to avoid hazardous river and stream areas during adverse conditions. Sources: OnlineKhabar, Khabarhub, Reporters Nepal · AI-assisted summary by WeNepal

Narayani River hits record 11.94m level in Chitwan

The Narayani River in Chitwan reached a record high of 11.94 meters on 27 September 2026, according to the Narayani Basin Field Office in Bharatpur. This measurement at the Devghat station surpasses the previous record of 11.6 meters set in 2024. Although levels dropped to 11.75 meters by late afternoon, the river remains significantly above the 9-meter danger threshold. Engineer Sumit Adhikari noted that continued rainfall in the hills could cause further fluctuations. Sources: Ratopati English, The Annapurna Express, Khabarhub English · AI-assisted summary by WeNepal

Krishnabhir landslide cleared, traffic back on Nagdhunga-Muglin road

Vehicles are moving again on the Nagdhunga-Muglin road section after landslide debris at Krishnabhir was removed, Ratopati English reports. Satendra Mishra, Information Officer of the Nagdhunga-Muglin Road Project (West Section), said the slide had fallen on the road's retaining wall and the gabion wall beside it had collapsed, but 2 to 3 metres of ground still separate the main track from the damage and the surface shows no major cracks. Heavy machinery has been deployed to clear slides at seven other points, including Panidhara, Dharapani, Jawang, Jalbire and Rorang. Continued rain is slowing the work, and travellers have been urged to take care. Sources: Ratopati English · AI-assisted summary by WeNepal

Nepal, in minutes — in your inbox

The Pulse every morning. No spam, unsubscribe any time.