Residents residing in Pammal have called on the Highways Department to expand a 200-metre section along the Pammal-Thiruneermalai Main Road. Commuters regularly rely on this passage to travel toward Thiruneermalai as well as the Outer Ring Road. The route branches off the main thoroughfare past the Rettai Pillaiyar Koil Bus stop junction, where a right turn directs traffic toward Anakaputhur. According to community members, authorities had stated several years ago that plans were in place to widen the narrow stretch, but no physical construction work took place. Daily traffic congestion continues to affect hundreds of vehicle operators attempting to cross the intersection without adequate space. In addition to the narrow roadway, storm-water drain construction on Pallavaram Main Road remains unfinished. Because the infrastructure is incomplete, runoff water frequently flows along the sides of the road. Local drivers and residents state that both widening the road surface and raising its elevation are necessary measures to prevent local flooding.
Pammal Residents Demand Widening of 200-Metre Main Road Stretch
Local motorists face heavy traffic as calls grow to complete storm-water drains and prevent area flooding.
1 min read
0:33
In short
- Pammal residents have asked the Highways Department to expand a 200-metre section of main road.
- Storm-water drainage systems along Pallavaram Main Road remain incomplete, causing surface runoff.
- Commuters use the affected junction to travel toward Anakaputhur, Thiruneermalai, and the Outer Ring Road.
From public sources and the WeNepal research team
https://wenepal.com/article/pammal-residents-demand-widening-of-200-metre-main-road-stretch-20261123

Comments
Comments are not open yet. We are building moderation first so the conversation stays safe. Use the contact form to reach the newsroom.
Contact